No |
Clients |
Job Description |
Project |
Main |
Contract |
|
|
Name |
|
|
Year |
Contractor |
Sum (RM) |
|
1 |
Prima Nova |
Cadangan Landskap
utk Sepanjang |
|
Thulus Kurnia |
|
|
|
|
|
Persisiran Tasik
Sepanjang Lot-lot |
|
(M) Sdn Bhd |
|
|
|
|
|
Banglo bagi
Pembangunan PT. |
2004 |
|
65,000.00 |
|
|
|
|
151439,15140 di Tmn.
Tasik PR |
|
|
|
|
|
|
|
Puchong Mukim
Petaling, Daerah |
|
|
|
|
|
|
|
Petaling , Selangor
DE. Land Scaping |
|
|
|
|
|
|
|
Soft Scape and
Hardscape |
|
|
|
|
2 |
PKNS Infra
|
Cadangan Pembangunan
|
|
Kimoyama |
|
|
|
Shah Alam |
Campuran Fasa 3.Yg.
Mengandungi |
|
Mecscon |
|
|
|
|
|
864 Yunit Rumah
Pangsa , Kos |
2004 |
(M) S/B |
1,880,000.00 |
|
|
|
|
Sederhana 7 Ting.
Dgn. Lift di Sek.11 |
|
|
|
|
|
|
|
Pusat Bandar
Sg.Buloh Blk. D, E & F |
|
|
|
|
|
|
|
Damansara 2nd phase
2 Blk. D, E & F. |
|
|
|
|
3 |
PKE Transport |
To Run and Lay 4'' &
2'' GI Pipe at |
2004 |
Bumiemas Setia |
85,000.00 |
|
|
North Port Klang |
Factory Lot 6579
Port Klang |
|
(M) Sdn Bhd |
|
|
|
|
|
To do External 4''
Cold Water and |
|
|
|
|
|
|
|
Bomba 4'' Pipe |
|
|
|
|
4 |
Damai Hebat S/B |
Cadangan Pembinaan
Gerai Plumbing |
2004 |
Bumiemas Setia |
760,000.00 |
|
|
|
|
Hydrant and Sewerage
Work at |
|
(M) Sdn Bhd |
|
|
|
|
|
Puchong Maju Jaya
Shop's to supply |
|
|
|
|
|
|
|
labour & material to
complete the |
|
|
|
|
|
|
|
building works |
|
|
|
|
5 |
PKNS Infra
|
Cadangan Pembangunan
|
|
Kimoyama |
|
|
|
Shah Alam |
Campuran Fasa 3.Yg.
Mengandungi |
|
Mecscon |
|
|
|
|
|
864 Yunit Rumah
Pangsa , Kos |
2004 |
(M) S/B |
2,300,000.00 |
|
|
|
|
Sederhana 7 Ting.
Dgn. Lift di Sek.11 |
|
|
|
|
|
|
|
Pusat Bandar
Sg.Buloh Blk. D,E & F |
|
|
|
|
|
|
|
Damansara 1st phase
3 Block K & L |
|
|
|
|
|
|
|
To supply labour and
to do brick |
|
|
|
|
|
|
|
works Drainage
system & Filing |
|
|
|
|
|
|
|
works for Block K &
L |
|
|
|
|
6 |
IQ Design Sdn Bhd |
Plumbing & Sanitary
Works for |
|
Bumiemas Setia |
165,000.00 |
|
|
|
|
One Unit 2 Storey
Bungalow at |
2004 |
(M) Sdn Bhd |
|
|
|
|
|
No.6, Jalan 5 / 19
PJ |
|
|
|
|
|
|
|
Electrical &
Plumbing Work |
|
|
|
|
7 |
PKNS Infra
|
Cadangan Pembangunan
|
|
Kimoyama |
|
|
|
Shah Alam |
Campuran Fasa 3.Yg.
Mengandungi |
|
Mecscon |
|
|
|
|
|
864 Yunit Rumah
Pangsa , Kos |
2004 |
(M) S/B |
3,150,000.00 |
|
|
|
|
Sederhana 7 Ting.
Dgn. Lift di Sek.11 |
|
|
|
|
|
|
|
Pusat Bandar
Sg.Buloh Blk. D,E & F |
|
|
|
|
|
|
|
Damansara 2nd phase
2 Block |
|
|
|
|
|
|
|
D , E & F. To supply
labour and to do |
|
|
|
|
|
|
|
brick works Drainage
system & |
|
|
|
|
|
|
|
Filing works for
Block D, E, & F |
|
|
|
|
8 |
Kimoyama |
Cadangan Pembangunan
|
2003 |
Bumiemas Setia |
258,000.00 |
|
|
Mecscon (M) S/B |
Campuran Fasa 3.Yg.
Mengandungi |
|
(M) Sdn Bhd |
|
|
|
|
|
864 Yunit Rumah
Pangsa , Kos |
|
|
|
|
|
|
|
Sederhana 7 Ting.
Dgn. Lift di Sek.11 |
|
|
|
|
|
|
|
Pusat Bandar
sg.Buloh Blk. D,E & F |
|
|
|
|
|
|
|
To Do Water Tank
Connection |
|
|
|
|
9 |
TNB Jalan Pudu KL |
To Do Stone Chipping
& Landscaping |
2003 |
Anjung |
124,000.00 |
|
|
|
|
Work sat PMU Jln.
Pudu KL |
|
Enterprise |
|
|
10 |
PKNS Infra
|
Cadangan Pembangunan
|
|
Kimoyama |
|
|
|
Shah Alam |
Campuran Fasa 3.Yg.
Mengandungi |
2003 |
Mecscon |
|
|
|
|
|
864 Yunit Rumah
Pangsa , Kos |
|
(M) S/B |
1,460,000.00 |
|
|
|
|
Sederhana 7 Ting.
Dgn. Lift di Sek.11 |
|
|
|
|
|
|
|
Pusat Bandar
Sg.Buloh Blk. D,E & F |
|
|
|
|
|
|
|
Damansara 1st phase
3 Block K & L |
|
|
|
|
|
|
|
To do water
Reticulation & internal |
|
|
|
|
|
|
|
Plumbing
|
|
|
|
|
11 |
Bell & Order
|
M & E work for 1000
unit L / cost |
2003 |
Direct |
1,518,189.00 |
|
|
Berhad Sunway |
House , 740 unit
medium cost |
|
|
|
|
|
|
|
Apartment Semenyeh
|
|
|
|
|
|
|
|
Hulu Langat |
|
|
|
|
12 |
Nas Citra S/B |
To do M & E work for
5 unit 10 |
2002 |
Direct |
3,261,000.00 |
|
|
Bandar Hilir |
storey building Kem.
Pertahanan |
|
|
|
|
|
Melaka |
|
M'sia Sg.Besi KL |
|
|
|
|
13 |
Rohas-Euco
|
Erection of 250ft
type A |
|
Rohas-Euco
|
886,000.00 |
|
|
Industries Bhd |
broadcast tower at
Gunung |
2001 |
Industries Bhd |
|
|
|
|
|
Ledang Microwave
Station |
|
|
|
|
|
|
|
Tangkak, Johor |
|
|
|
|
14 |
Erec |
|
Erection of 200ft
Microwave |
|
Rohas-Euco
|
540,000.00 |
|
|
Telecommunication |
Tower TM Chaah Baru |
2001 |
Industries Bhd |
|
|
|
Tower |
|
Johor |
|
|
|
|
|
15 |
Erec |
|
Erection of 200ft
Microwave |
|
Rohas-Euco
|
720,000.00 |
|
|
Telecommunication |
Tower TM air Balaoi |
2001 |
Industries Bhd |
|
|
|
Tower |
|
Johor |
|
|
|
|
|
16 |
Webforge S.E.A |
Steel Work for Sign
Board and |
|
|
|
|
|
Regional office |
Upgrade Road and
Gate. |
2001 |
Direct |
83,000.00 |
|
|
Shah Alam . |
|
|
|
|
|
|
17 |
Gadang Engineering
|
To Build Three unit
Project |
|
|
|
|
|
Sdn. Bhd. Wisma |
Sign Board at
Precinet 15 |
2001 |
Direct |
160,000.00 |
|
|
Gadang Sri
|
and to supply
complete |
|
|
|
|
|
Damansara.
|
project signboard |
|
|
|
|
18 |
GI Corporation
|
To do Renovation
work at all |
|
|
|
|
|
(IJM) Wisma IJM |
Factory near Puchong
Area . |
2001 |
Direct |
168,000.00 |
|
|
Petaling Jaya
|
Puchong Utama ,
Puchong |
|
|
|
|
|
|
|
Maju Jaya , Puchong
Perdana |
|
|
|
|
19 |
O' Connors Sdn. |
To fabricate Steel
works gate to |
|
|
|
|
|
Bhd. Petaling Jaya. |
upgrade Security
System and |
2001 |
Direct |
145,000.00 |
|
|
|
|
all entrance and to
run safety |
|
|
|
|
|
|
|
Electrical system |
|
|
|
|
20 |
Nestle Foods (M) |
To Build and upgrade
waste |
|
|
|
|
|
Sdn. Bhd. |
water Treatment
Pond's & |
2001 |
Direct |
135,000.00 |
|
|
Petaling Jaya |
Electrical work at
the |
|
|
|
|
|
|
|
oxidation pond |
|
|
|
|
21 |
National Starch & |
To renovation
internal Building |
|
|
|
|
|
Chemical (M) Sdn.
|
work at Production
Area and |
2001 |
Direct |
128,000.00 |
|
|
Bhd. Shah Alam |
painting work |
|
|
|
|
22 |
Federal Power
|
To do renovation and
upgrade |
|
|
|
|
|
Sdn. Bhd.
|
Production area and
|
2001 |
Direct |
158,000.00 |
|
|
Shah Alam . |
Packaging including
painting |
|
|
|
|
|
|
|
& Electrical work |
|
|
|
|
23 |
Pencawang masuk |
To build 20 unit
Telephone |
|
|
|
|
|
Utama TNBT KL |
pole and lay
Telephone Cable |
2001 |
Direct |
54,000.00 |
|
|
Hicom Shah Alam |
for the internal
Auto Control |
|
|
|
|
24 |
TNBT K. L
|
To Build one unit
concrete |
|
KRIS Heavy |
|
|
|
Port Klang
|
base for Transformer
footing |
2001 |
Engineering |
140,000.00 |
|
|
Power Station
|
including running
Armoud cable |
|
Const. S/B |
|
|
|
Kapar |
|
|
|
|
Bangsar |
|
|
25 |
TNBT Pandan Maju |
Upgrade Road work
and |
|
D' Line |
168,000.00 |
|
|
132 KV |
|
Drainage System at
PMU |
2001 |
Construction |
|
|
|
|
|
Pandan Maju
|
|
|
|
|
26 |
TNBT K. L
|
Upgrade Road works
and |
|
Anjung |
175,000.00 |
|
|
Connought Bridge |
Drainage System
including |
2001 |
Enterprise |
|
|
|
Power Station
|
Landscaping work |
|
Gombak |
|
|
27 |
Rohas-Euco
|
Erection of 200ft
Microwave |
|
Rohas-Euco
|
650,000.00 |
|
|
Industries Bhd |
Tower TM Gemenceh,
Negeri Sembilan |
2001 |
Industries Bhd |
|
|
28 |
Rohas-Euco
|
Erection of 200ft
Microwave |
|
Rohas-Euco
|
820,000.00 |
|
|
Industries Bhd |
Tower Pongsu Seribu
Seberang |
2001 |
Industries Bhd |
|
|
|
|
|
Perai , Pulau Pinang |
|
|
|
|
29 |
Rohas-Euco
|
Erection of 200ft
Microwave |
|
Rohas-Euco
|
735,000.00 |
|
|
Industries Bhd |
Tower Jenderam Hilir
, |
2001 |
Industries Bhd |
|
|
|
|
|
Selangor |
|
|
|
|
|
30 |
Sime UEP Pilmor
|
Build and Design
Landscape |
|
VM |
|
|
|
Ara Damansara
|
Project Phase A & B
including |
2001 |
Enterprise |
620,000.00 |
|
|
Petaling Jaya |
walking pavement and |
|
Kapar. |
|
|
|
Selangor |
|
concrete walk path |
|
Selayang |
|
|
31 |
Jabatan Perpaduan
|
Demolish and Build
one unit |
|
Teleport |
|
|
|
Negara , HQ
|
Tadika Kemas OUG K.
L. and |
2001 |
Enterprise |
174,000.00 |
|
|
Kuala Lumpur |
to do landscaping ,
Bomba |
|
Gombak |
|
|
|
|
|
pipe & Electrical |
|
|
|
|
32 |
Kozato Kizai (M) |
To do premix
concrete Car Park |
|
|
|
|
|
S/B Shah Alam , |
with lining and
supply Post & |
2001 |
Direct |
118,000.00 |
|
|
Selangor |
|
Plants |
|
|
|
|
|
33 |
K.L Airport Services |
Upgrade Building at
Cargo |
|
|
|
|
|
Sdn. Bhd. Southern
|
Terminal and
Forwarding |
2001 |
Direct |
240,000.00 |
|
|
Support Zone KLIA |
including supply &
install 6'' |
|
|
|
|
|
|
|
MSCC pipe |
|
|
|
|
34 |
Hicom Properties
|
Road Works and
Drainage |
|
|
|
|
|
Glenmarie |
system at the main
Car Park |
2000 |
Direct |
240,000.00 |
|
|
Shah Alam
|
and at the Kanteen
area |
|
|
|
|
|
|
|
|
|
|
|
|
|
35 |
Pan Pacific Hotel
|
Road Works Lining,
Drainage |
|
|
|
|
|
The Pan Pacific |
& curb at the Golf
Resort |
2000 |
Direct |
160,000.00 |
|
|
Glenmarie Resort |
Car Park |
|
|
|
|
|
|
Hotel , S.Alam |
|
|
|
|
|
|
36 |
New / Sekolah
|
Road Works, Road
Lining, |
|
Pembinaan
|
|
|
|
Menengah USJ 23 |
Curb, Drainage ,
water |
2000 |
Hasnal Sdn. |
650,000.00 |
|
|
Subang Jaya |
reticulation
Plumbing work |
|
Bhd.B.Pahat |
|
|
37 |
Dutch Baby
|
Upgrade walkway and
to run 6'' |
|
|
|
|
|
Industries (M)
|
MSCC Pipe from main
to |
2000 |
Direct |
170,000.00 |
|
|
Sdn. Bhd. PJ. Sel. |
oxidation pond |
|
|
|
|
38 |
Multiple Dimension
|
Upgrade the
Landscaping and water |
|
|
|
|
|
Sdn. Bhd. Glenmarie |
fall ponds including
upgrade all |
2000 |
Direct |
123,000.00 |
|
|
Shah Alam . |
Garden lights Pole's |
|
|
|
|
39 |
Erec |
|
Design supply and
Installation of |
|
Rohas-Euco
|
930,000.00 |
|
|
Telecommunication |
250ft Microwave
Tower for |
2000 |
Industries Bhd |
|
|
|
Tower |
|
Binariang
communication S/B |
|
|
|
|
|
|
|
at Arau Perlis |
|
|
|
|
JBA LICENCE CLASS 1 & 2 (NUM : 1232) |
|
|
|
|
|
|
|
|
|
|
|
No |
Clients |
Jobs |
Project |
Main |
Contract |
|
|
Name |
Description |
Year |
Contractor |
Sum (RM) |
|
1 |
Project Chinese
School |
Jabatan Bekalan Air
( Tee Connection |
2002 |
Tukang Pipe |
155,000.00
|
|
|
Puchong 14th Miles. |
for Bulk Meter). |
|
Brickfields |
|
|
|
|
Cold water Plumbing
and Sanitary |
|
|
|
|
|
|
system. |
|
|
|
|
|
|
Hose Reel and
Hydrant System. |
|
|
|
|
2 |
Sekolah Menengah
|
Water Reticulation
Main Paip |
2002 |
Tukang Pipe |
167,000.00
|
|
|
Teknik Cheras,
|
Tank system and Hose
Reel System |
|
Brickfields |
|
|
|
Kuala Lumpur. |
Hydrant Piping. |
|
|
|
|
3 |
Sg.Pau, SIK, Kedah
|
Penempatan semula
(Project Empangan |
2002 |
Tukang Pipe |
2,374,549.86
|
|
|
Darul Aman |
Beris) 300 & 400MM Ø
M.S.Pipe |
|
Brickfields |
|
|
4 |
Kapar-Sabak Bernam
|
Project Membaik
Pulih dan Menaik Araf |
2002 |
Tukang Pipe |
19,950,891.00
|
|
|
Kilang Banting |
Jalan Persekutuan 5
(Water Services) |
|
Brickfields |
|
|
|
Kapar-Kuala Selangor |
Segment 1B
250,300,450,600,700,900 |
|
|
|
|
|
|
& 300MM M.S. Pipe
|
|
|
|
|
5 |
University
Technology |
Construction and
Completion of External |
2001 |
Tukang Pipe |
7,150,601.00
|
|
|
Petronas. |
Water supply works
for Infrastructure |
|
Brickfields |
|
|
|
|
(Package 1C) for
development at |
|
|
|
|
|
|
Tronoh, Perak.
External Water |
|
|
|
|
|
|
Reticulation works
900MM Ø M.S. Pipe |
|
|
|
|
6 |
Dewan Serbaguna |
Internal Plumbing |
2001 |
Tukang Pipe |
53,400.00
|
|
|
Section 24, Shah
Alam. |
|
|
Brickfields |
|
|
|
Selangor. |
|
|
|
|
|
7 |
Brite - Cost Sdn.
Bhd. |
Jabatan Bekalan Air
( Tee Connection |
2001 |
Tukang Pipe |
140,050.00
|
|
|
Pinwang Industrial
|
for Bulk Meter). |
|
Brickfields |
|
|
|
Park, Mukim
Petaling, |
Cold water Plumbing
and Sanitary |
|
|
|
|
|
Daerah |
System. |
|
|
|
|
|
Petaling, Selangor. |
Hose Reel and
Hydrant System. |
|
|
|
|
|
|
Water reticulation
works. |
|
|
|
|
8 |
Lot 7215, Mukim |
Cadangan Pembangunan
kawasan |
2000 |
Tukang Pipe |
412,016.00
|
|
|
Kapar, Daerah Klang,
|
Industry Campuran.
600 & 750MM |
|
Brickfields |
|
|
|
Selangor. |
Ø M.S. Pipe |
|
|
|
|
9 |
Lot 24059
(P.T.12787) |
Cadangan Perumahan
222 Unit |
2000 |
Tukang Pipe |
168,000.00
|
|
|
Mukim Cheras, Sel. |
150 & 200MM Ø UPVC |
|
Brickfields |
|
|
10 |
Pusat Pentadbiran
|
Cadangan Bekalan Air
bagi |
2000 |
Tukang Pipe |
2,400,000.00
|
|
|
Kerajan Persekutuan |
Pembangunan Precint
11.150, 200 7 |
|
Brickfields |
|
|
|
Putrajaya |
250MM Ø M.S. Pipe |
|
|
|
|
11 |
Air Sg. Terip Laying |
Project Loji
Pembersihan 1,200MM |
2000 |
Tukang Pipe |
750,000.00
|
|
|
|
Ø M.S. Pipe |
|
Brickfields |
|
|
12 |
Yew Hong - Nilai |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
61,000.00
|
|
|
|
for Bulk Meter). |
|
Brickfields |
|
|
13 |
Waterlite Sdn. Bhd. |
External Water
Reticulation 8 Biocks |
2000 |
Tukang Pipe |
91,710.00
|
|
|
Pandan Indah |
Jabatan Bekalan Air
( Tee Connection |
|
Brickfields |
|
|
|
|
for Bulk Meter). |
|
|
|
|
14 |
Pilmoor Saujana |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
74,500.00
|
|
|
|
for Bulk Meter). |
|
Brickfields |
|
|
|
|
Hose Reel and
Hydrant System |
|
|
|
|
15 |
Kamental Trading S/B |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
83,000.00
|
|
|
Kaw. Perusahaan Sg. |
for Bulk Meter). |
|
Brickfields |
|
|
|
Buluh, Mukim Sg.
Buluh, |
Hose Reel and
Hydrant System Cold |
|
|
|
|
|
Daerah Petaling, Sel. |
Water Plumbing and
Sanitary System. |
|
|
|
|
16 |
Shah Alam Industries
|
Water Reticulation
Works |
2000 |
Tukang Pipe |
72,000.00
|
|
|
|
To supply all Labour,
Materials, Fittings |
|
Brickfields |
|
|
|
|
and other related
Equipment's. |
|
|
|
|
|
|
Hase Reel and
Hydrant System Cold |
|
|
|
|
|
|
Water Plumbing and
Sanitary System. |
|
|
|
|
17 |
Kuala Selangor |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
86,000.00
|
|
|
Bus Stop |
for Bulk Meter). |
|
Brickfields |
|
|
|
|
Hose Reel and
Hydrant system |
|
|
|
|
|
|
To supply all Labour,
Materials, Fittings |
|
|
|
|
|
|
and other related
Equipment's. |
|
|
|
|
18 |
Hytex - Kepong |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
149,000.00
|
|
|
|
for Bulk Meter). |
|
Brickfields |
|
|
|
|
Hose Reel and
Hydrant System |
|
|
|
|
|
|
To supply all Labour,
Materials, Fittings |
|
|
|
|
|
|
and other related
Equipment's. |
|
|
|
|
|
|
Cold water Plumbing
and Sanitary |
|
|
|
|
|
|
System. |
|
|
|
|
|
|
CO 2 System for sub
- station. |
|
|
|
|
19 |
Nilai - Laundry |
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
77,000.00
|
|
|
|
For Bulk Meter). |
|
Brickfields |
|
|
|
|
Hose Reel and
Hydrant System |
|
|
|
|
20 |
Maxisegar |
Internal Plumbing |
2000 |
Tukang Pipe |
43,000.00
|
|
|
|
|
|
Brickfields |
|
|
21 |
Project Kai Peng |
Nozzle & Cylinder |
2000 |
Tukang Pipe |
35,230.00
|
|
|
|
|
|
Brickfields |
|
|
22 |
Project Tenaga
|
Jabatan Bekalan Air
( Tee Connection |
2000 |
Tukang Pipe |
130,000.00
|
|
|
National Berhad -
Jalan |
for Bulk Meter). |
|
Brickfields |
|
|
|
Meru, Klang |
Hose Reel and
Hydrant System. |
|
|
|
|
23 |
Muhibbah Engineering |
Plumbing and
Sanitary System |
1999 |
Tukang Pipe |
190,000.00
|
|
|
(M) Sdn. Bhd. Mukim |
Water Reticulation
Main Paip CO 2 |
|
Brickfields |
|
|
|
Klang,Daerah Klang, |
System for Sub -
Station Tank System |
|
|
|
|
|
Selangor Darul Ehsan. |
and Hose Reel System
Hydrant Piping. |
|
|
|
|
24 |
United Packaging
|
Jabatan Bekalan Air
( Tee Connection |
1999 |
Tukang Pipe |
145,000.00
|
|
|
Industries Sdn. Bhd. |
for Bulk Meter).
Tank System |
|
Brickfields |
|
|
|
Pusat Perindustrian
Sg. |
and Hose Reel System
Hydrant Piping. |
|
|
|
|
|
Chua, Kajang. |
CO 2 System for Sub
- Station |
|
|
|
|
25 |
P.K.N.S. Tanjung
Malim |
P.K.N.S. Tanjung
Malim |
1999 |
Tukang Pipe |
650,000.00
|
|
|
|
|
|
Brickfields |
|
|
26 |
SPMM Kajang Plant |
Water Reticulation
Works To supply all |
1999 |
Tukang Pipe |
162,000.00
|
|
|
|
Labour, Materials,
Fittings and other |
|
Brickfields |
|
|
|
|
related Equipments.
Hose Reel and |
|
|
|
|
|
|
Hydrant System Cold
Water Plumbing |
|
|
|
|
|
|
and Sanitary
System.Jabatan Bekalan |
|
|
|
|
|
|
Air (Tee Connection
for Bulk Meter). |
|
|
|
|
27 |
Lot PT.No.111, |
Putra Jaya Cadangan
Pembangunan |
1999 |
Tukang Pipe |
574,027.00
|
|
|
No H.S D 3605 Mukim
|
Komplex Kerajaan
Fasa 1B Mengandungi |
|
Brickfields |
|
|
|
Dengkil, Daerah |
7 Block Bangunan
Pejabat, 1 Block |
|
|
|
|
|
Putra Jaya,
Selangor. |
Setingkat Medan
Letak Kereta Bawah |
|
|
|
|
|
Untuk Tetuan |
Aras Tanah, Plaza
dan lain kerja |
|
|
|
|
|
Putrajaya Holdings
|
berkaitan di atas
Parcel C Seluas 34.23 |
|
|
|
|
|
Sdn. Bhd. |
Ekar, Sebahagian
daripada Percinct 1 |
|
|
|
|
28 |
Tenaga Nasional
|
Schematic Diagram of
Cold Water |
1998 |
Tukang Pipe |
130,000.00
|
|
|
Berhad Pilmoor |
Plumbing and Details
of Tank |
|
Brickfields |
|
|
|
Saujana, Mukim |
Support. |
|
|
|
|
|
Damansara Daerah
|
CO 2 System for Sub
- Station |
|
|
|
|
|
Petaling Selangor. |
Jabatan Bekalan Air
( Tee Connection |
|
|
|
|
|
|
For Bulk Meter). |
|
|
|
|
29 |
Project
Bangi-Kompleks |
To Install Hydrant
System and Hose |
1998 |
Tukang Pipe |
103,000.00
|
|
|
Membeli belah |
reel system |
|
Brickfields |
|
|
|
Bandar Baru Bangi
|
Plumbing and
Sanitary |
|
|
|
|
30 |
Kota Kemuning -
|
Plumbing and
Sanitary |
1998 |
Tukang Pipe |
162,000.00
|
|
|
Housing Development |
To install Hydrant
System and Hose |
|
Brickfields |
|
|
|
|
reel system. |
|
|
|
|
31 |
United cables
|
Hydrant Pipe and
Hose Reel system |
1998 |
Tukang Pipe |
135,000.00
|
|
|
Manufacturing S/B |
Jabatan Bekalan Air
( Tee Connection |
|
Brickfields |
|
|
|
Bukit Beruntung Ind. |
for Bulk Meter). |
|
|
|
|
|
Park,Mukim Serendah, |
|
|
|
|
|
|
Dearah Hulu
Selangor. |
|
|
|
|
|
32 |
Minply Taman |
Pili Bomba,Hose reel
system |
1998 |
Tukang Pipe |
126,000.00
|
|
|
Perindustrian
Puchong |
Hydraulic springler
system |
|
Brickfields |
|
|
|
Seksyen 6, Mukim |
Jabatan bekalan Air
( Tee Connection |
|
|
|
|
|
Petaling, Dearah
|
for Bulk Meter). |
|
|
|
|
|
Petaling, Selangor. |
To install Hydrant
system and Hose |
|
|
|
|
|
|
reel system. |
|
|
|
|
33 |
Di Bandar Baru
Sungai |
Pili Bomba, Hose
reel system |
1998 |
Tukang Pipe |
79,400.00
|
|
|
Buluh untuk P.K.N.S. |
Hydraulic Springler
System |
|
Brickfields |
|
|
|
|
179 Unit - Housing
Project |
|
|
|
|
34 |
starion Products S/B |
Schematic Diagram of
cold Water |
1998 |
Tukang Pipe |
112,350.00
|
|
|
Mukim Semenyih, |
Plumbing and Details
of Tank support. |
|
Brickfields |
|
|
|
Dearah Hulu Langat, |
Sanitary System CO 2
System for |
|
|
|
|
|
Selangor. |
Sub - station. |
|
|
|
|
35 |
Lot PT 35, Jln
Lapangan |
Cadangan Dewa Bahasa
& Pustaka |
1998 |
Tukang Pipe |
984,000.00
|
|
|
Terbang, Kuala
lumpur. |
Complex. 375 & 900MM
Ø M.S. Pipe |
|
Brickfields |
|
|
36 |
Lot 6306 di
Universiti |
Cadangan Membina &
Menyiapkan Dua |
1998 |
Tukang Pipe |
219,327.00
|
|
|
Putra Malaysia,
|
Buah Bangunan Lapan
Tingkat Kolej |
|
Brickfields |
|
|
|
Serdang, Selangor. |
Kediaman Pelajar
Ke-10 & Ke-11. |
|
|
|
|
|
|
200MM Ø M.S. Pipe |
|
|
|
|
37 |
Monorel Kuala Lumpur |
Project Monorel
Kuala Lumpur in - Civil |
1998 |
Tukang Pipe |
364,175.00
|
|
|
|
Works. 600MM Ø M.S.
Pipe |
|
Brickfields |
|
|
38 |
Batanah Sdn. Bhd. |
Proposed Industrial
& Residential |
1998 |
Tukang Pipe |
579,528.00
|
|
|
Serendah, Selangor |
Development. 150MM Ø
M.S. Pipe |
|
Brickfields |
|
|
39 |
Vision City Wawasan |
Vision City Wawasan
2020 Laying |
1998 |
Tukang Pipe |
415,000.00
|
|
|
|
300MM Water Main |
|
Brickfields |
|
|
40 |
Vision City Wawasan |
Vision City Wawasan
2020 Incoming |
1998 |
Tukang Pipe |
920,000.00
|
|
|
|
400MM Ø Water Supply
pipe |
|
Brickfields |
|
|
41 |
Akitek Padu |
Internal Plumbing
and Sanitary |
1997 |
Tukang Pipe |
65,000.00
|
|
|
Sungai Choh,Mukim |
(Industrial Project) |
|
Brickfields |
|
|
|
Serendah,Daerah Hulu |
|
|
|
|
|
|
Selangor.Selongor. |
|
|
|
|
|
42 |
Kilang Roti Kunci
Emas |
Jabatan Bekalan Air
( Tee Connection |
1997 |
Tukang Pipe |
105,000.00
|
|
|
Sdn.Bhd. |
For Bulk Meter). |
|
Brickfields |
|
|
|
Bandar
Kinrara,Daerah |
Hydrant Pipe and
Hose Reel System |
|
|
|
|
|
Petaling. |
Sanitary System. |
|
|
|
|
|
|
Cold Water Plumbing |
|
|
|
|
43 |
Brite-Cost Sdn.Bhd. |
Jabatan Bekalan Air
( Tee Connection |
1997 |
Tukang Pipe |
113,000.00
|
|
|
Pinwang Ind.l Park. |
For Bulk Meter). |
|
Brickfields |
|
|
|
Mukim Petaling
Daerah |
Internal Plumbing
and Sanitary |
|
|
|
|
|
Petaling |
Hydrant Pipe and
Hose Reel system |
|
|
|
|
|
|
CO 2 System for Sub
- Station |
|
|
|
|
44 |
T.E.M. Engineering
Sdn. |
Jabatan Bekalan Air
( Tee Connection |
1997 |
Tukang Pipe |
108,000.00
|
|
|
Bhd. |
For Bulk Meter). |
|
Brickfields |
|
|
|
Pinwang Ind. Park. |
Plumbing and
Sanitary |
|
|
|
|
|
|
Hydrant Pipe and
Hose Reel System |
|
|
|
|
|
|
CO 2 System for Sub
- Station. |
|
|
|
|
45 |
Putra Jaya |
Putra Jaya Propose
Trunk Main for |
1997 |
Tukang Pipe |
950,000.00
|
|
|
|
Construction Supply
200MM & 300MM |
|
Brickfields |
|
|
|
|
Ø M.S. Pipe |
|
|
|
|
46 |
Kem Rejimen
21Artileri |
Cadangan Membina &
Menyiapkan |
1997 |
Tukang Pipe |
1,945,351.65
|
|
|
Gemas, Ng. Sembilan |
Kem . Pakej 2 700MM
Ø M.S. Pipe |
|
Brickfields |
|
|
47 |
International
Airport, |
Construction & Civil
Works for Eng. |
1997 |
Tukang Pipe |
1,400,000.00
|
|
|
Sepang Malaysia |
Support Buildings,
KL. 150 & 200MM |
|
Brickfields |
|
|
|
|
Ø M.S. Pipe |
|
|
|
|
48 |
Bukit Tinggi Resort
S/B |
Proposed Bkt. Tinggi
Golf & Country Club |
1997 |
Tukang Pipe |
513,016.00
|
|
|
|
To Club House at
Bukit Tinggi, Bentong |
|
Brickfields |
|
|
|
|
Pahang D.M. 300 &
500MM Ø M.S. Pipe |
|
|
|
|
49 |
Dynamic Management
|
Water Reticulation -
610 Unit |
1996 |
Tukang Pipe |
112,000.00
|
|
|
Sdn. Bhd. |
5 Block (Housing
Project) |
|
Brickfields |
|
|
|
Bandar Puchong Jaya |
Hydrant Pipe &
Sanitary System |
|
|
|
|
50 |
Kem - Rejimen
Artilery |
Sg. Way Construction
Gemas 450MM |
1996 |
Tukang Pipe |
1,010,000.00
|
|
|
|
Ø M.S. Pipe |
|
Brickfields |
|
|
51 |
KLIA Sepang |
Co-Gen Plant (Nam
Fatt Construction) |
1996 |
Tukang Pipe |
543,121.55
|
|
|
|
250MM & 300 Ø M.S.
Pipe |
|
Brickfields |
|
|
52 |
Ulu Langat |
Propose 350MM Ø Mild
Steel - Pipe 5th |
1995 |
Tukang Pipe |
600,000.00
|
|
|
|
Mile to 18th Mile |
|
Brickfields |
|
|
53 |
T.N.B Bangi |
T.N.B. Ikatan
Project Bangi 450MM |
1995 |
Tukang Pipe |
1,950,000.00
|
|
|
|
& 600MM Ø M.S. Pipe |
|
Brickfields |
|
|
CIVIL & CONTRACTUAL WORKS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No |
Clients |
Job Description |
Project |
Main |
Contract |
|
|
Name |
|
Year |
Contractor |
Sum (RM) |
|
1 |
Mahkota Technologies |
Proposed to Supply
Labour for Cable |
2004 |
Power Net
Electricals |
125,977.00
|
|
|
Sdn. Bhd. |
Laying c/w Cable
Accessories |
|
|
|
|
|
|
and installation of
Switchboards for |
|
|
|
|
|
|
the comfort Rubber
Co-Gent Plant |
|
|
|
|
|
|
Taiping, Perak |
|
|
|
|
2 |
Property Department |
Cadangan Memasang
Kabel |
2004 |
Power Net
Electricals |
27,349.00
|
|
|
KTMB KL |
Sistem dan Keperluan
Teknologi |
|
|
|
|
|
|
maklumat untuk
Pejabat KTMD |
|
|
|
|
|
|
Tingkat 1 Bangunan
Setesen KL |
|
|
|
|
3 |
Kolej Kedah |
To run complete
Electrical Cable |
2004 |
Databridge |
50,398.00
|
|
|
|
work |
|
Communication Sdn
Bhd |
|
|
4 |
Lumut / PSC - ND |
Electrical work in
existing sever |
2003 |
Databridge |
11,750.00
|
|
|
|
room at 2nd floor
MSA |
|
Communication Sdn
Bhd |
|
|
5 |
Celcom WTS 21st
|
Structured Cabling
and |
2003 |
Alur Tenaga Sdn. Bhd. |
17,892.20
|
|
|
Floor |
Containment System
Installation |
|
|
|
|
6 |
MAXIS |
To run LAN Computer
(Cat Five) |
2001 |
Databridge |
58,000.00
|
|
|
Subang Hi Tec |
cable at Computer
Department |
|
Communication Sdn
Bhd |
|
|
7 |
MAXIS Kepong |
To run LAN Computer
(Cat Five) |
2001 |
Databridge |
65,000.00
|
|
|
|
cable at Computer
Department |
|
Communication Sdn
Bhd |
|
|
8 |
Samsung Electronic |
To supply and
install Electric Cable |
2000 |
Databridge |
75,000.00
|
|
|
Senawang N.Sembilan |
Tranking and cable
work |
|
Communication Sdn
Bhd |
|
|
9 |
Bright RIMS |
To supply and
install High Bay |
1999 |
Direct |
77,120.00
|
|
|
Manufacturing S/B |
Light and security
system |
|
|
|
|
|
Sg.Buloh Selangor |
|
|
|
|
|
10 |
Kementrian |
To do Electrical
work for main dB |
1999 |
Anjung Enterprise |
45,000.00
|
|
|
Perdagangan |
box workstation area
and mange |
|
Gombak |
|
|
|
dalam Negeri |
main cable |
|
|
|
|
|
Menara Maybank KL |
|
|
|
|
|
11 |
KLIA Sepang |
To run GI conduit
pipe 1.300 meter |
1999 |
Johnson Controller
|
140,000.00
|
|
|
Main Terminal |
and electrical works |
|
Kudelings |
|
|
|
|
|
|
|
|
|
12 |
Brickfield College |
To run complete
Electrical cable |
1998 |
Telepower Electrical |
33,000.00
|
|
|
Tun Sambanthan KL |
work at college (
3rd floor ) |
|
Engineering |
|
|
13 |
Tenaga National |
M&E works & fire
protection works |
1998 |
Kris Heavy Engg&Const |
538,000.00 |
|
|
Berhad |
for 132/33/11 KV TNB
Substation at |
|
S/B No.24, Bangsar |
|
|
|
|
Bukit Jelutong Razak
Shah Alam |
|
Utama 1, Bang. utama
|
|
|
|
|
|
|
59000 Kuala Lumpur |
|
|
14 |
Tenaga National
|
Local Transmission &
Erection |
1998 |
Kris Heavy Engg&Const |
735,400.00 |
|
|
Berhad |
(LTE)for 132/22/11
KV-GIS TNB |
|
S/B No.24, Bangsar |
|
|
|
|
substation at Tasek
Cement. Ipoh |
|
Utama 1, Bang. Utama
|
|
|
|
|
|
|
59000 Kuala Lumpur |
|
|
15 |
Celcom Petronet JV |
Supply &
Installation of machine and |
1998 |
CMC Engg. S/B No.15A
|
608,281.29 |
|
|
|
cable laying for
Fiber optic Link at |
|
Jln Ampang 4/14 Ban.
|
|
|
|
|
JKR Petaling PTT to
Bangi |
|
Baru Ampang
|
|
|
|
|
|
|
6800 Ampang |
|
|
16 |
Celcom Petronet JV |
Supply &
Installation of machine and |
1998 |
CMC Engg. S/B No.15A
|
72,000.00 |
|
|
|
cable laying for
Fiber optic Link at |
|
Jln Ampang 4/14 Ban.
|
|
|
|
|
JKR Petaling PTT to
Bangi |
|
Baru Ampang
|
|
|
|
|
|
|
6800 Ampang |
|
|
17 |
TUDM Hospital |
M & E works for TUDM
Hospital |
1997 |
Pembinaan Bumi |
120,000.00 |
|
|
|
at Pulau Pangkor
Lumut |
|
Mekar S/B Jln.Raja
Laut |
|
|
|
|
|
|
Kuala Lumpur |
|
|
18 |
Kohno Plastics (M) |
M & E works ,
Underground cable |
1997 |
Direct |
110,550.00 |
|
|
S/B Persiaran Sabak |
works at Kohno
Plastics (M) S/B |
|
|
|
|
|
Bernam Hicom
|
|
|
|
|
|
|
Industrial Estate |
|
|
|
|
|
|
40000 Shah Alam |
|
|
|
|
|
19 |
Jayantilal Carpets
S/B |
M & E works and
Building Earthling |
1997 |
Direct |
95,000.00 |
|
|
No.2, Rawang
|
for Jayantial S/B
Rawang |
|
|
|
|
|
Integrated
Industrial |
|
|
|
|
|
|
Park Mukim Rawang
|
|
|
|
|
|
|
Daerah Gombak |
|
|
|
|
|
20 |
Harakah Pas (M) S/B |
M & E works,
Renovation works 4 |
1997 |
Direct |
150,000.00 |
|
|
Jalan Pahang |
storey building and
cable works for |
|
|
|
|
|
Kuala Lumpur. |
Harakah Pas (M) S/B |
|
|
|
|
21 |
Chee Low Restaurant |
|
|
Direct |
|
|
|
Sdn. Bhd. |
M & E works,
Renovation works for |
1997 |
|
70,000.00 |
|
|
Petaling Jaya. |
wiring for shop lots
at Petaling Jaya |
|
|
|
|
|
|
|
|
|
|
|
22 |
Wang Thai Restaurant |
M & E works , civil
works for Wang |
1997 |
Direct |
350,000.00 |
|
|
Sdn. Bhd. |
Thai Restaurant at
Yachan , |
|
|
|
|
|
Yaohan. Seremban |
Seremban |
|
|
|
|
|
|
|
|
|
|